Bathroom Remodeling

Bathrooms usually fail from water, not from wear — so we build them waterproofing-first. Behind the tile you see is a sealed shower system, correct slopes to drain, and ventilation that actually moves moisture out of the room.

What’s included

  • Demolition and debris disposal
  • Shower and tub replacement with modern waterproofing systems
  • Tile and stone installation
  • Vanity, countertop and fixture installation
  • Plumbing fixture relocation where feasible
  • Ventilation and lighting upgrades
  • Glass, mirrors and finish hardware

Typical timeline

A full hall or primary bathroom typically takes about 3–5 weeks on site.

Common questions

What causes most bathroom remodel problems?

Leaks from failed waterproofing behind tile are the number one cause. We use membrane waterproofing systems and flood-test pans where applicable, so the pretty surface is not the only thing keeping water out.

Can a small bathroom feel bigger without moving walls?

Often, yes — a curbless or glass-enclosed shower, large-format tile, wall-mounted fixtures and better lighting can make the same footprint feel noticeably larger.

Every project starts with a free site visit and a written, itemized proposal. Call (520) 858-9998 or use the estimate form — we serve the San Francisco Bay Area.

Request a free estimate

Tell us about your project and we will follow up with next steps.