New Construction

Ground-up residential construction managed end to end: site preparation, foundation, framing, systems and finishes, with inspections scheduled at every stage and a written proposal that stages the work clearly before we start.

What’s included

  • Site preparation, excavation and grading
  • Foundation and structural concrete
  • Framing and roofing
  • Coordination of plumbing, electrical and HVAC systems
  • Exterior finishes and hardscape
  • Inspection management at every stage of the build

Typical timeline

A single-family new build typically runs about 8–14 months; the plan set, lot conditions and city inspections drive the real schedule.

Common questions

Do you build from our plans or work design-build?

Both — we regularly build from completed architect plans, and we can also coordinate with designers and engineers if you are starting from a concept.

How are costs kept under control on a long build?

The proposal stages the work with allowances in writing, and changes are priced and approved before they are built — not discovered on an invoice.

Every project starts with a free site visit and a written, itemized proposal. Call (520) 858-9998 or use the estimate form — we serve the San Francisco Bay Area.

Request a free estimate

Tell us about your project and we will follow up with next steps.